Research on Intelligent Project Management Methods

 

Fengxi Gao, Mingze Sun

State Grid Liaoning Electric Power Company Limited Economic Research Institute, Shenyang, Liaoning, 110015, China

 

Abstract: To implement the requirements of the State Grid Corporation's organizational structure management, the company has specially established an architecture control mechanism. It conducts digital architecture control centered on the three stages of feasibility study, design, and launch, to build a closed-loop management throughout the entire process. The feasibility study stage is the starting point of the project. It strictly aligns with the company's unified architecture and technical routes, incorporating architecture compliance review into the mandatory review items of the feasibility study, comprehensively reviewing the project's architecture concept and technical selection. This ensures that deviations are prevented from occurring from the very beginning and aligns with the company's digital strategy. The design stage is based on the approved feasibility study and detailed design content. A professional team is formed to focus on the quality of the detailed design documents, meticulously reviewing the architecture details, functional modules, and interface specifications, ensuring that the design fully covers the requirements of the feasibility study and is in line with the unified architecture, providing precise guidance for the construction. The launch stage is based on the approved detailed design. It comprehensively verifies the actual system construction results, and focuses on verifying the consistency of the architecture implementation, technical routes, and design schemes. For the problems identified in each stage, a ledger is established to clearly define the responsible party and the rectification deadline. Generally, before the issues are not rectified, the subsequent work shall not be advanced. This ensures the formation of a management chain of "review–problem feedback–rectification–recheck–closed loop", guaranteeing the implementation and effectiveness of the control.

 

Keywords: Architecture management requirements; Architecture Control; Full-process closed-loop management

 

References

[1]
Structural Finite Element Analysis on Side Wall Pouring Formwork Trolley for Subway Station. Yan Fang Ma; Zhen Tong He; Qin Zhao. Applied Mechanics and Materials.2013
[2]
Analyzing causal relationships between delay factors in construction projects: A case study of Iran. Jahangoshai Rezaee Mustafa; Yousefi Samuel; Chakrabortty Ripon K. International Journal of Managing Projects in Business.2019
[3]
Is Project Management: Size, Practices and the Project Management Office. Nancy L. Martin; J. Michael Pearson; Kimberly Furumo. Journal of Computer Information Systems.2007
[4]
Structural Equation Model of Building Information Modeling Maturity. Yunfeng Chen; Hazar Dib;;Robert F. Cox; Mark Shaurette; Mihaela Vorvoreanu. Journal of Construction Engineering and Management.2016
[5]
Project Portfolio Reliability: A Bayesian Approach for LeAgile Projects. Sagar Chhetri; Dongping Du; Susan Mengel. Engineering Management Journal.2023
[6]
A Two-Layer Causal Knowledge Network Construction Method Based on Quality Problem-Solving Data. Yubin Wang; Shirong Qiang; Xin Yue; Tao Li; Keyong Zhang.Systems.2025
[7]
Object-Oriented Technology Model of Regional Industrial Economic Innovation Project Management System. Zhang Weiwei. Computational Intelligence and Neuroscience.2022
[8]
Navigating the Complexity of Dispute Management in Construction: A DEMATEL and Bayesian Network Approach. Shojaat Mehrnoosh; Malekitabar Hassan; Haghayegh Isfahani Hossein. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction.2025
Download PDF
Innovation Series

Innovation Series is an academic publisher publishing journals and books covering a wide range of academic disciplines.

Contact

Francesc Boix i Campo, 7
08038 Barcelona, Spain